Platform
One platform for every EHS process.
Twenty-two integrated modules in five groups, sharing one set of people, locations and actions. Begin with the processes that matter most and extend at your own pace.
One home for every tool
- Every module a person can use, in the five groups
- A personal to-do list across all modules
- Favourites, notifications and team chat in one place
R
Risk & Compliance
Control risk before work begins.

Risk Management
- Hazard identification and risk register (HIRA) for every activity
- Task risk assessments, method statements and last-minute risk checks
- Before-and-after risk heat maps, with controls assigned as actions
Permits to Work
- Hot work, confined space, work at height, electrical and more
- Isolation and gas-test certificates linked to the permit
- Role-based approvals on the phone; simultaneous operations conflicts flagged
Management of Change
- Plant, process, procedure, software, site and organisational changes
- Screening and tier from your own risk matrix
- Pre-start safety review; temporary, emergency and override changes closed on time
Contractor Management
- One contractor register, prequalified in proportion to risk
- Hazard categories set the documents and controls required
- Work packages by site, kick-off meetings and performance
Chemical Management
- Inventory by store and location, with GHS hazard classification
- Safety data sheet library and chemical risk assessment
- Exposure monitoring, health surveillance and hazardous waste
Legal Compliance
- Applicable laws screened for each location, with country packs
- Recurring legal obligations turned into tasks with due dates
- Evidence of compliance kept against every obligation
Compliance Calendar
- Every due date from every module in one calendar
- Month, year and task views by location and owner
- Reminders and escalation before anything goes overdue
EHS Document Management System
- Controlled documents from global to site level
- Change requests, review, digital approval and release
- Master document list, periodic review and superseded revisions kept
A
Audit & Inspection
Find and fix hazards at the source.

EHS Audits
- Scored audit checklists built from your management system
- Findings with photographic evidence and auditor interviews
- Audit reports generated, findings raised as tracked actions
Inspections
- Planned inspections, leadership walks and Life-Saving Rule checks
- Photographic evidence on every observation
- Frequency planning, with every non-conformity raised as an action
Behaviour Based Safety
- Four-colour tickets: recognise, coach and correct
- Just and fair culture check before any follow-up
- Anonymous QR-card reporting with no login
STOP Work
- Every worker empowered to stop unsafe work
- Life-Saving Rule and at-risk behaviour categories
- Reviewed, followed up and trended for leadership
Equipment & Maintenance
- Equipment register with third-party certificates and calibration
- Entry and periodic inspections from a QR scan, with 40 category checklists
- Colour-coded inspection stickers and preventive maintenance dates
D
Development & Training
A competent workforce, verified.

EHS Trainings
- Workers registered by QR code, phone or manual entry
- Sessions, attendance and assessments on the phone, in English or Hindi
- Training cards on a pass, with validity dates and expiry alerts
RADAR E-Learn
- Online courses on any phone or computer
- Courses assigned by role through a matrix
- Final tests, certificates and progress for each learner
A
Analytics & Insights
Decisions grounded in evidence.

Analytics & Insights
- Report pages for incidents, training, inspections and more
- Compare sites and periods side by side
- OSHA incident rates (TRIR, DART) from hours worked
- A corporate view across every location and project
Heat Stress Monitor
- Heat index and WBGT-based work/rest guidance
- A live heat flag board for each site
- Acclimatisation tracking for new and returning workers
Lifting Plan Analysis
- Pre-lift checklist for every lift
- Non-critical and critical lift calculators
- Crane utilisation and rigging geometry drawn as a diagram
Dropped Objects Calculator
- Impact energy and consequence of a falling object
- Exclusion zone calculated and drawn for the job
R
Response Tracking
Learn from every event.

Incident Logs
- Injuries, near misses, property damage and environmental events
- Quick report from the phone, completed by the responder
- OSHA recordkeeping logs and incident rates
Incident Investigation
- 5 Whys, Fishbone, Fault Tree, Bowtie, ECF and 8D
- Human factors and causal chain analysis
- Lessons learned shared across the organisation
Action Tracking
- One action register for every module
- Owners, due dates, reminders and escalation
- Closure verified with evidence
Roadmap
EHS today. ESG & Sustainability next.
Built on the same people, locations and data as every other module.
In development
ESG & Sustainability
Environmental, social and governance performance measured, managed and reported on the same platform that holds the organisation's EHS data.
- Greenhouse gas inventory covering Scope 1, 2 and 3 emissions, in line with the GHG Protocol
- Energy, water, waste and effluent performance tracked against corporate targets
- Social indicators drawn from existing records: safety performance, training hours and workforce wellbeing
- Disclosure-ready reporting aligned with frameworks such as GRI and India's BRSR
- Sustainability targets, initiatives and progress dashboards for executive and board review
30-day free trial
Identify the right starting point.
Share your priorities and our specialists will recommend an initial set of modules for your operations. Every module can be evaluated on a dedicated trial site, free of charge for 30 days.